960kW/2MWh BESS Installation in Japan

case 1

Capacity: 960kW/2MWh

Location: Osaka Japan

Delivery date:11/2022

Description:

On-grid & off-grid operation and switching.

In the on-grid mode, the solar + storage system participates in the regulation  of the power market and realizes the application of peak-load shifting and

virtual power grid. In the off-grid mode, the solar + storage system will work as an intelligent microgrid to supply power to the area independently,

and solve the problems of power outage, production shutdown and suspension of the industrial and commercial enterprises and users in the area

case 1-1 case 1-2